Supporting Jumbo in the Greater Stella Area Development Project
Supporting Jumbo in the greater Stella Area Development Project; a mooring system pre-installation project, providing survey and positioning services.

Region: Central North Sea, Block UKCS 30/6 and 29/10 - 175 miles east-southeast of Aberdeen
Water depth: 85m
Date: May to July 2014
Work included the installation of LBL (long baseline) arrays, required for high accuracy subsea positioning for mooring piles, and supporting the installation of the piles themselves (with heading and inclination) followed by the mooring lines.