Advanced marine construction support – Field Development at 1200m water depth offshore India
In the period from November 2007 to April 2008, iSURVEY completed the survey support for APL/AKER during the field development at the Krishna Godavari MA-D6 Field.
iSURVEY’s work scope included:
- LBL array planning
- Preparation of Survey Procedures and Documentation
- Mobilization of survey and positioning equipment on two installation vessels with WROV’s
- Calibrations and dimensional control surveys of vessels, WROV and structures.
- Deepwater wet tests during transit to field
- LBL array installation and calibrations
- Installation support and monitoring for:
- Production Manifold
- Manifold suction pile bases
- FPSO Suction Pile Anchors
- FPSO Anchor Mooring Lines Wet Store Clump Weights - Vessel and WROV positioning
- As Built Surveys
- Reporting and documentation
With permission from our client, quotes from APL’s written feedback to iSURVEY during the project debrief:
“iSURVEY acted independently and required basically no supervision.”
“All documentation, procedures, reports were professionally produced. The procedures prior to the commencement of the project were spot on from the beginning and changes/updates were performed and reissued almost immediately. The reports during project execution were produced and sent in before anyone had a chance to ask for them.”
“Both onshore and especially offshore, the flexibility of the team made for a very pleasant environment to work in.”
“It was an absolute pleasure working together with iSURVEY. Thank you very much for your much needed support and for the willingness to give the 200% effort for this project!”